Concrete Footing Calculator

Estimate the concrete for one circular footing or pier from its finished diameter and depth, with waste-adjusted ready-mix and bag alternatives.

Project calculator

Enter the footing dimensions

Measure the finished circular concrete footing, not the supported post.

in
in
%

Adjust for excavation variation, spillage, and ordering tolerance.

Optional. Your ZIP code does not change this estimate.

Plan responsibly

Before You Build

This project may be subject to local permit, zoning, site, or structural requirements.

  • Frost depthObtain the locally adopted frost-depth requirement from the building department.
  • Loads, soil, and seismic criteriaConfirm project loads, soil-bearing criteria, slopes, groundwater, expansive-soil conditions, and seismic requirements.
  • Permit and inspection requirementsConfirm plan, permit, and pre-pour inspection requirements locally.

Local requirements control: Model-code references do not confirm the code edition, amendments, zoning rules, permit requirements, or site criteria adopted for your project.

Not an engineered footing design: Do not use a volume result to select footing width, thickness, depth, or reinforcement. Structural or geotechnical review may be necessary.

View code references

Model-code reference

2021 IRC, Section R403.1

Footings: The IRC addresses residential footing design in relation to imposed loads, soil characteristics, and bearing on undisturbed soil or engineered fill.

Source: ICC Digital Codes: 2021 IRC Section R403.1 · Reviewed 2026-08-24

Local requirements may differ. A model-code reference does not confirm the code edition, amendments, zoning rules, or permit requirements adopted where the project is located.

Model-code references

2021 IRC, Section R403.1: Footings. Source: ICC Digital Codes: 2021 IRC Section R403.1. Reviewed 2026-08-24.

Local requirements may differ. Verify the adopted code, amendments, zoning rules, and permit requirements with the local authority.

Methodology

How we calculate this

Plan Otter converts the diameter and depth to feet, halves the diameter to find radius, applies the cylinder formula for cubic feet, divides by 27 for cubic yards, and applies the selected waste allowance before calculating whole-bag alternatives.

π × (diameter ÷ 2)² × depth = cylindrical volume

Measure the concrete, not the post

Enter the finished diameter and depth of the concrete footing itself. This tool does not subtract a post, bell shape, enlarged base, or embedded hardware.

Confirm footing design locally

Footing diameter and depth depend on loads, soil, frost depth, drainage, reinforcement, and local requirements. The calculator estimates material after dimensions are chosen; it does not design the footing.

Ready mix or bags

The result reports both a waste-adjusted ready-mix volume and whole 40, 60, and 80 lb bag alternatives. Confirm delivery minimums and approximate bag yields with suppliers.

Worked examples

Concrete Footing Calculator examples

18 in × 36 in deck footing

With 10% waste, one cylindrical footing needs about 0.22 yd³, or 10 80-lb bags.

24 in × 48 in pier footing

With 10% waste, the estimated order is 0.51 yd³, or 24 80-lb bags.

Common questions

Concrete Footing Calculator FAQ

How do I calculate concrete for a round footing?

Convert diameter and depth to the same unit, divide diameter by two for radius, and use π × radius² × depth. Convert cubic feet to cubic yards by dividing by 27.

Does this calculator choose footing dimensions?

No. It estimates concrete for dimensions you provide. Loads, soil, frost depth, reinforcement, and local requirements determine design.

Does the estimate subtract a post or anchor?

No. The footing is modeled as a full cylinder. Small embedded hardware is not subtracted, and irregular excavations require separate judgment.

Why are bag quantities rounded up?

Partial bags are not normally purchasable, so each bag alternative is rounded upward using the cited approximate mixed yield.

Should I add waste?

Waste can cover excavation variation, spillage, and ordering tolerance. Adjust the allowance to the project and supplier guidance.

Sources

Assumptions and references

Last reviewed: 2026-08-22

Related tools

Continue planning