Roofing planning tool

Gutter Size Calculator

Planning arithmetic only — not a gutter/downspout design or code result. This tool converts the tributary catchment area, runoff coefficient, design rainfall intensity, and per-unit capacities you enter into a peak design flow and a whole capacity-unit count. It does not look up or approve rainfall, survey roof geometry, choose a runoff coefficient, verify manufacturer capacity, or design gutter profile/slope/length, outlets, downspout spacing, elbows, restrictions, fasteners, debris/ice allowance, maintenance, primary/secondary overflow, ponding or structural rain load, underground piping, detention/infiltration, grading, erosion control, or discharge. Verify local code and stormwater/property rules, approved discharge location, foundation and neighboring-property impacts, manufacturer data, and the complete route to a lawful receiving point. Use a qualified drainage/building professional and the authority having jurisdiction for consequential work.

Explicit drainage arithmetic

Compare entered gutter-system capacities

Planning arithmetic only — not a gutter/downspout design or code result. This tool converts the tributary catchment area, runoff coefficient, design rainfall intensity, and per-unit capacities you enter into a peak design flow and a whole capacity-unit count. It does not look up or approve rainfall, survey roof geometry, choose a runoff coefficient, verify manufacturer capacity, or design gutter profile/slope/length, outlets, downspout spacing, elbows, restrictions, fasteners, debris/ice allowance, maintenance, primary/secondary overflow, ponding or structural rain load, underground piping, detention/infiltration, grading, erosion control, or discharge. Verify local code and stormwater/property rules, approved discharge location, foundation and neighboring-property impacts, manufacturer data, and the complete route to a lawful receiving point. Use a qualified drainage/building professional and the authority having jurisdiction for consequential work.

Changes all displayed and submitted area, rainfall, and capacity units together; it does not convert entered values.
Use a verified tributary area or itemize only explicit plan rectangles. No slope or roof geometry is inferred.
Enter the verified horizontal tributary area; no roof dimensions are inferred.
Required. Do not apply a pitch factor or guess tributary areas; obtain qualified field review when they are unknown.
Enter the coefficient from your identified project criterion. No coefficient is supplied or recommended.
Enter a project-specific intensity in in/hr from an identified source. The tool performs no rainfall lookup and supplies no default.
Record the source, location criterion, duration, and return period used for the entered in/hr value.
Required provenance reminder. Record the source and criteria above; the calculator does not verify the source or intensity.

Candidate capacities

Enter each independently verified per-unit capacity for the exact component or system conditions. No product, gutter size, or installed count is recommended.

Candidate capacity 1
Required unique ID used to preserve this candidate in the calculation record.
Required descriptive label for the independently verified capacity.
Classifies the entered capacity only; it does not select or approve a component.
Enter the independently sourced per-unit capacity in gpm for the exact conditions being evaluated.
Record the manufacturer table, test, calculation, conditions, or other identified source.
Required: at least one and up to 50 independently sourced candidates.

Plan responsibly

Before You Build

This project may be subject to local permit, zoning, site, or structural requirements.

  • Permit and drainage reviewConfirm permits, inspections, and drainage review required by the authority having jurisdiction.
  • Property boundariesVerify that routing and discharge do not create prohibited impacts across a property boundary.
  • Easements and discharge rightsConfirm easements, drainage rights, and lawful discharge locations before selecting an outlet route.
  • Local rainfall and amendmentsUse locally accepted rainfall data, runoff criteria, amendments, and approved product capacities.

Entered-capacity arithmetic only: This calculator does not design gutter geometry, downspout routing, overflow, underground drainage, detention, erosion control, or lawful discharge.

Verify every input: Rainfall intensity, runoff coefficient, catchment area, and candidate capacity must come from accepted project evidence; none is inferred.

View code references

Model-code reference

Local requirements may differ. A model-code reference does not confirm the code edition, amendments, zoning rules, or permit requirements adopted where the project is located.

Model-code references

2024 IPC, Section Chapter 11: Storm drainage. Source: ICC — 2024 IPC Chapter 11 Storm Drainage. Reviewed 2026-08-24.

Local requirements may differ. Verify the adopted code, amendments, zoning rules, and permit requirements with the local authority.

Methodology

How we calculate this

Uses only explicit user-entered tributary catchment, coefficient, rainfall intensity, and candidate capacity. Candidates are independent; no geometry, rainfall, coefficient, or product capacity is inferred.

US Q = C × A_ft² × I_in/hr × 4/385; metric Q = C × A_m² × I_mm/hr ÷ 60; count = exact ceil(Q / entered capacity)

Entered evidence only

Enter a verified capacity for exact component/system conditions. The calculator supplies no candidate capacities and reports only capacity units needed at the entered per-unit capacity.

Professional boundary

Planning arithmetic only — not a gutter/downspout design or code result. This tool converts the tributary catchment area, runoff coefficient, design rainfall intensity, and per-unit capacities you enter into a peak design flow and a whole capacity-unit count. It does not look up or approve rainfall, survey roof geometry, choose a runoff coefficient, verify manufacturer capacity, or design gutter profile/slope/length, outlets, downspout spacing, elbows, restrictions, fasteners, debris/ice allowance, maintenance, primary/secondary overflow, ponding or structural rain load, underground piping, detention/infiltration, grading, erosion control, or discharge. Verify local code and stormwater/property rules, approved discharge location, foundation and neighboring-property impacts, manufacturer data, and the complete route to a lawful receiving point. Use a qualified drainage/building professional and the authority having jurisdiction for consequential work.

Worked examples

Gutter Size Calculator examples

Common questions

Gutter Size Calculator FAQ

Does this recommend a component or installed count?

No. It performs entered-value arithmetic only; layout, routing, product verification, discharge, and applicable requirements remain outside scope.