Plan responsibly
Before You Build
This project may be subject to local permit, zoning, site, or structural requirements.
- Permit and inspectionConfirm locally required permits, inspections, approved appliance scope, and manufacturer installation instructions.
- Seismic restraintVerify locally required seismic restraint and structural support for the selected appliance and location.
- Local installation requirementsVerify fuel, venting, combustion air, electrical, relief, drainage, scald protection, and locally adopted amendments with qualified professionals.
FHR comparison only: The result is a First Hour Rating comparison target, not tank capacity, product selection, delivered performance, or installation design.
Scald hazard: Hot water can scald. Follow manufacturer instructions and qualified local requirements for temperature control and scald protection.
View code references
Model-code reference
2018 IPC, Section Chapter 5
Water-heater installation: Model-code installation provisions do not convert peak-hour demand arithmetic into tank capacity, product selection, or an approved installation.
Source: ICC — 2018 IPC Chapter 5 Water Heaters · Reviewed 2026-08-24
Local requirements may differ. A model-code reference does not confirm the code edition, amendments, zoning rules, or permit requirements adopted where the project is located.
Model-code references
2018 IPC, Section Chapter 5: Water-heater installation. Source: ICC — 2018 IPC Chapter 5 Water Heaters. Reviewed 2026-08-24.
Local requirements may differ. Verify the adopted code, amendments, zoning rules, and permit requirements with the local authority.
Methodology
How we calculate this
Consumer mode starts with DOE worksheet gallons-per-use values labeled as editable planning averages, not measurements or facts about the home. Replace them when you have a better measured assumption. Advanced keeps the same entries and offers direct event, additional-demand, and optional manufacturer-FHR fields. Only positive-count events are submitted. Each quantity is multiplied by its entered gallons per event; acknowledged additional peak-hour gallons are then added. Exact bounded scaled-integer arithmetic preserves up to six decimal places.
minimum FHR comparison target = Σ(quantity × entered or edited gallons/event) + Σ(additional peak-hour gallons)
Edit the planning averages
The DOE worksheet values are a starting handoff from builder-style planning to homeowner inputs. They remain editable; use a measured or product-specific gallons-per-use assumption when available.
Avoid double counting
Add only peak-hour gallons not already represented in event rows; otherwise demand will be counted twice.
Compare FHR, not tank capacity
Compare the result with manufacturer/EnergyGuide First Hour Rating. FHR is one-hour hot-water delivery beginning with a fully heated tank; it is not nominal tank capacity.
Installation and scald boundary
A qualified plumbing/heating installer must verify the appliance and installation with the manufacturer and authority having jurisdiction, including fuel, venting, combustion air, electrical, seismic restraint, relief, scald protection, drainage, structural support, local code, permits, and inspections. Hot water can scald; hand-test it and follow manufacturer and qualified/local requirements.
Sources
Assumptions and references
Last reviewed: 2026-08-24