Concrete planning tool

Ready-Mix Concrete Calculator

Turn a rectangular pour into a supplier-order quantity. Choose the increment your supplier accepts, then confirm mix design, minimum order, delivery access, schedule, and quote directly.

Supplier-order calculator

Prepare a supplier order

Calculate the delivered quantity, then confirm every order condition with your supplier.

Choose only an increment your supplier accepts.

Plan responsibly

Before You Build

This project may be subject to local permit, zoning, site, or structural requirements.

  • Concrete mixture and exposureConfirm the required strength, durability, exposure, air entrainment, aggregate, and approved project specification.
  • Inspection and testingConfirm local inspection, sampling, testing, placement, and weather-protection requirements before ordering.

Local requirements control: Model-code references do not confirm the code edition, amendments, zoning rules, permit requirements, or site criteria adopted for your project.

Volume is not a mixture specification: An order quantity does not select a compliant concrete mixture or establish placement, consolidation, curing, or protection requirements.

View code references

Model-code reference

2021 IRC, Section R402.2

Concrete performance: The IRC contains model-code provisions for specified concrete strength and weathering-related durability where residential concrete provisions apply.

Source: ICC Digital Codes: 2021 IRC Section R402.2 · Reviewed 2026-08-24

Local requirements may differ. A model-code reference does not confirm the code edition, amendments, zoning rules, or permit requirements adopted where the project is located.

Model-code references

2021 IRC, Section R402.2: Concrete performance. Source: ICC Digital Codes: 2021 IRC Section R402.2. Reviewed 2026-08-24.

Local requirements may differ. Verify the adopted code, amendments, zoning rules, and permit requirements with the local authority.

Methodology

How we calculate this

Plan Otter converts dimensions to feet, calculates rectangular-prism volume, divides cubic feet by 27, applies the chosen waste percentage, and rounds only the final quantity upward to the supplier increment selected by the user.

ceil(((length × width × thickness ÷ 27) × (1 + waste %)) ÷ increment) × increment

Use this for supplier ordering

This tool focuses on the delivered ready-mix quantity to discuss with a supplier. It does not select a mix design or duplicate the broader slab-planning output.

Confirm supplier constraints

Ask about minimum orders, short-load charges, accepted ordering increments, truck access, washout, lead time, unloading time, and cancellation terms before ordering.

Treat waste as a planning input

Uneven grade, form variance, spillage, and handling can change required volume. Select an allowance appropriate to the site and confirm the final quantity with the supplier or contractor.

Worked examples

Ready-Mix Concrete Calculator examples

12 ft × 9 ft pour

At 6 inches thick with 10% waste and a 0.25 yd³ increment, the supplier-order quantity is 2.25 yd³.

24 ft × 20 ft pad

At 4 inches thick with 10% waste and a 0.25 yd³ increment, the supplier-order quantity is 6.75 yd³.

Common questions

Ready-Mix Concrete Calculator FAQ

How do I calculate a ready-mix concrete order?

Calculate cubic volume using compatible units, convert cubic feet to cubic yards, apply the selected waste allowance, then round up to an ordering increment accepted by your supplier.

Does this calculator know my supplier's minimum order?

No. Minimums, increments, truck capacities, short-load policies, and delivery charges vary. The increment is user-selected and all supplier constraints must be confirmed directly.

Does the result include a concrete price?

No. Plan Otter does not infer local supplier pricing. Request a delivered quote that covers the mix, delivery, fees, timing, and site conditions.

Which concrete mix should I order?

Mix design depends on structural requirements, exposure, placement, finishing, climate, and local rules. Use project specifications or professional and supplier guidance rather than this volume calculator.

Why is the final order rounded up?

Ready-mix is ordered in supplier-defined increments. The calculator rounds the adjusted volume up to the increment you select so the displayed order does not fall below the calculated requirement.